Kitchen renovation in Tauranga and the Bay of Plenty.
A kitchen renovation asks you to make a long run of decisions in the right order, often while you are still living in the house. Get the order right and the project stays calm. Get it wrong and the cost shows up later, in rework, delays and a kitchen that never quite works.
I'm Kate Blakeborough, a CKDNZ-qualified kitchen designer working on kitchen renovations across the Bay of Plenty, from Tauranga, Mount Maunganui and Papamoa to Te Puke and beyond. This page sets out how a renovation runs from first conversation to finished kitchen: the steps, the timeline, how payments and changes are handled, and what to check before you sign anything.
I come to your home, design from the actual space, and stay with the project through procurement and project management integration, so the detail is held by one person from start to finish.
How do you plan a kitchen renovation?
Renovation checklist
Plan your kitchen renovation, in order
Tick off each step as you go. Open any step to see why it sits where it does, and keep your own notes alongside it.
0 of 8 complete
-
Start with how you live, who cooks and what isn't working
Think about who cooks, who gathers at the bench, what frustrates you now, and how the household will use the space over the next ten years. These answers shape every decision that follows. Once you get in touch, my client questionnaire takes you through all of it: how you live and who cooks, ergonomics and which hand you favour, your styling and colour palette, and the surfaces you are drawn to.
-
Set a working budget, as a range with a contingency
Work to a range rather than a fixed figure, and hold a contingency of around 10 to 15 per cent for what a renovation uncovers, such as old wiring or walls that are out of true. The kitchen cost guide explains where the money goes.
-
Bring a designer in, before the trades
Your first consultation takes place in your home, so the design starts from the real light, flow and connection to the rooms around it. As a result, trades price a resolved plan rather than a guess.
-
Resolve the layout first, before any finishes
We settle layout, workflow, storage and ergonomics first, because they decide how the kitchen performs every day. Choosing finishes before the layout is settled is the most common cause of regret and rework.
-
Choose materials and colour, once the layout is right
You choose materials once the layout is right, so neither gives way to the other. In coastal homes, this is also where we plan for moisture and salt air, and where I select flooring alongside the cabinetry.
-
Confirm pricing and sign, with scope and payments in writing
A firm price follows material selection, because materials are what move it. Before you sign, check you have the disclosure statement and consumer protection checklist, and that the agreement sets out the scope, payment stages, timeframe and how changes are agreed.
-
Coordinate the build, with trades sequenced around the cabinetry
Each trade arrives when the site is ready for them, from strip-out and pre-wiring through to cabinetry, benchtops and fit-off. If walls, plumbing or drainage move, check early with your council about building consent, because consent time can set the pace of the whole project.
-
Check and hand over, against the drawings and schedule
Before handover, I check the finished kitchen against the drawings and the fixtures and finishes schedule. Keep your agreement, drawings, schedule and warranty documents together.
If the renovation moves walls, plumbing or drainage, it may need a building consent. Check early with Tauranga City Council or Western Bay of Plenty District Council, because consent time can set the pace of the whole project.
How long does a kitchen renovation take?
Allow roughly four to six months from first consultation to finished kitchen. Design, selections and pricing take around five to eight weeks, cabinetry is made over six to ten weeks, and on-site work takes six to eight weeks. Expect to be without a working kitchen for about four to six weeks.
Renovation timeline
From first conversation to finished kitchen
A typical Bay of Plenty kitchen renovation, stage by stage. Every project is different, so treat this as a guide rather than a programme.
- Design
- Pricing and agreement
- Cabinetry made
- On site
- Without a working kitchen
Most renovations take four to six months from first consultation to finished kitchen, with about four to six weeks without a working kitchen.
What can stretch the timeline
Building consent, structural changes, concealed problems found at strip-out, imported materials or appliances, how busy suppliers and cabinetmakers are, and the Christmas and New Year shutdown, when many suppliers close for two to three weeks, can all add time. So can changes made once work is under way, because we price, agree and order each one before it goes ahead.
The fabricator can only measure benchtops and splashbacks once the surfaces beneath them are in place. As a result, your choice of benchtop and splashback affects how long you're without a kitchen.
Decisions made on time keep a renovation moving more than anything else. That's why we settle selections before you sign the agreement, not during the build.

How do kitchen renovation payments work?
You pay in stages tied to clear points in the project, not as one large sum up front. Your agreement sets out each stage before you sign, so you know what every payment covers and when it falls due. I issue each claim formally under the Construction Contracts Act 2002.
Your design fee is included. It sits within the total price in your agreement, alongside the cabinetry, benchtops and everything else the agreement covers, rather than appearing as a separate invoice. I charge your first consultation separately, and my kitchen cost guide explains how pricing is worked out.
You pay the total in stages.
A typical schedule is a 60% deposit of the total price when you sign the agreement, 20% once your cabinetry is fitted, 15% once your benchtops are fitted, and the final 5% at practical completion. The deposit is the largest stage because I order materials and your cabinetry goes into production once you sign. Your agreement sets out the exact stages and amounts, so nothing arrives unexpectedly.
Appliances and lighting.
When I supply appliances and light fittings through my trade accounts, they sit outside the staged payment claims. I bill them on their own tax invoice, and you pay in full before I place the order. This also secures your models and pricing early, before stock or prices change.
Every claim follows the same rules.
Each payment claim states that it is made under the Construction Contracts Act, names the agreement and the work it covers, and shows the amount claimed, the running total and the due date. It comes with Form 1, the government notice that explains your rights and what to do if you disagree.
Trades bill you directly.
Plumbers, electricians and builders usually charge for the work they do and invoice you themselves. I coordinate them through project management integration. I don't run their costs through my accounts or add a margin.
Staged payments mean you pay as the work progresses, and you can always see what you've paid for.

What should you check before signing a kitchen renovation contract?
Before you sign
Two laws, two jobs
Building Act 2004
Before you sign
For residential work of $30,000 or more, including GST: a written contract, a disclosure statement about the business, and the government's consumer protection checklist.
Construction Contracts Act 2002
Once work is under way
How payments are claimed and answered. Each payment claim comes with Form 1, which explains your rights.
A sound agreement should give you
- A written agreementSigned before work starts. It's required at $30,000 and worth having below it.
- Disclosure and checklistGiven to you before you sign, not after.
- A defined scopeTied to the drawings and the fixtures and finishes schedule by version number and date.
- Clear pricingWhat is included and excluded: appliances, trades, consent fees, removal and disposal of the old kitchen.
- The payment scheduleEach stage, its amount and what triggers it.
- Agreed timingThe timeframe, and what could move it.
- A variation processChanges priced and agreed in writing before they happen.
- WarrantiesThe warranties and the defect repair period, stated plainly.
- Who does whatThe responsibilities of the designer, cabinetmaker, builder and each trade.
Every Design Suite project with joinery runs under a written agreement with disclosure, a staged payment schedule and written variations. You know where you stand before anything is ordered.

How are changes handled during a kitchen renovation?
I record every change as a written variation, stating what is changing, why, and the effect on price and timing. You agree to it in writing before it goes ahead, so your budget, drawings and site stay in step.
When the house is the cause.
Some changes are your choice. Others come from the house: the old kitchen only comes out once your new cabinetry is made, so surprises such as live cabling in a hidden junction box or a leaking pipe appear late. The trades make these safe and repair them before the cabinetry goes in, once you have agreed the price.
Why timing matters.
A change made during design costs very little. Once the cabinetry is ordered, the same change costs more. After every variation, I reissue the drawings and schedule, so everyone works from the same information.

What warranties come with a kitchen renovation?
A renovated kitchen is covered in three ways. Appliances, light fittings and hardware carry the manufacturer's warranty. Work done on site falls under the Building Act. When the kitchen is for your own home, the Consumer Guarantees Act also applies.
Appliances and lighting.
When I supply them through my trade accounts, you receive the manufacturer's warranty agreement. Terms vary by brand.
After handover.
For 12 months, the contractor must fix defects you report in writing. If the work itself was faulty, the Building Act's implied warranties allow a claim for up to 10 years. Neither covers damage from use, such as a benchtop scorched by a hot pan. If something goes wrong, get in touch and I'll help you work out who to contact.
Design-led or design-and-build: which suits you?
With design-and-build, one company designs and makes your kitchen, usually from its own range. In a design-led project, an independent designer resolves the kitchen around your home first, and the cabinetmaker then prices and makes the joinery to that design. For a simpler, product-led brief, design-and-build works well. Design-led suits a renovation where layout, flow and the wider home matter.
The difference is where the thinking starts. A design-led kitchen starts with the home and the way you live, and the cabinetry follows.
My approach draws on more than design training. Years as a chef taught me how a kitchen performs under real use. Construction and agreement experience keeps every design buildable. Postgraduate study in psychology shapes how I understand the way a household wants to live in a space.
See how the design process works.

Side by side
Design-led or design-and-build
| Compare | Design-and-build | Design-led |
|---|---|---|
| Starting point | The company's product range | Your home and how you live in it |
| Who designs | A designer or salesperson employed by the maker | An independent designer, CKDNZ-qualified in my case |
| Material choice | Usually limited to the maker's range | Drawn from across suppliers |
| Pricing | Often earlier, as one package | After you select materials, with the design fee included |
| Who makes the cabinetry | The same company | My recommended cabinetmaker or one you prefer |
| Well suited to | A like-for-like replacement or simple layout | A renovation that changes layout, flow or the connection to other rooms |
Both can produce a good kitchen. The difference is where the thinking starts.
Should the kitchen or the flooring go in first?
Flooring and cabinetry
Which goes in first?
Fixed floors
Laid first, under the cabinetry
Fixed in place, so the cabinetry can sit on top.
Tiles, polished concrete, glued-down timber
Floating floors
Laid after, to the kickboards
Needs room to expand and contract, so it can't sit under heavy cabinetry.
Laminate, vinyl plank
The details that matter
- Pinned floors move badlyAn island or a run of cabinets on a floating floor stops it moving with temperature and humidity. Over time that shows up as gapping, lifting or buckling elsewhere in the room.
- Appliance spaces need the floorRun the floor into the dishwasher and fridge spaces, whatever the type, so appliances slide out for servicing and sit level with the cabinetry.
- Floor height changes the cabinetryThe finished floor affects the kickboard height, the dishwasher space under the benchtop, and how the kitchen meets the rooms beside it. It needs to be known before the cabinetry is drawn.
- Fixed floors need protectingOnce laid, the floor needs covering while the cabinetry, benchtops and trades go in.
- Think aheadA fixed floor under the cabinetry leaves you free to change the layout later. A floating floor laid to the kickboards may leave an unfloored patch if cabinets are ever moved.
I select flooring alongside the cabinetry as part of kitchen interior design, so the order on site and the way the finishes read together are planned at the same time.
A Bay of Plenty kitchen renovation.
Oak and Brass Coastal Kitchen, Mount Maunganui.
This Mount Maunganui home in Tauranga had ceiling beams set at different heights, and the previous kitchen layout worked against them rather than with them.
Instead of hiding the structure, the tall cabinetry, bulkhead and ceiling detail were set to the beams, creating one level line across the room. A dual peninsula now opens the kitchen to the living space, with two edges for working and gathering, and integrated appliances keep the cabinet run unbroken. The laundry was designed to match, so the two spaces read as one home.
The kitchen now sits into the house as though it has always been there, with the beams and cabinetry reading as one calm line.
View the Oak and Brass Coastal Kitchen.


In our clients' words.
Renovating means living around the work. This is what clients say once their kitchen is finished.
“Kate was able to imagine a space that we couldn't see and worked with us in the most patient and professional manner with an eye for detail and turning the ideas into reality.”
“Kate was professional and enthusiastic about our kitchen renovation. She gave us heaps of ideas and was so helpful if you are a first-time renovator like we were.”
“Kates knowledge and truly personalised service built our confidence that we selected the right designer for our home remodel.”
Read more client reviews on ArchiPro.
Why Design Suite
What you can expect
| How I work | What it means for you | What stands behind it |
|---|---|---|
| Function resolved before finishes | Fewer regrets and less rework | A two-stage design process: layout first, then materials |
| Staged payments | You pay as the work progresses | Formal payment claims under the Construction Contracts Act, with Form 1 |
| Written agreement, disclosure and checklist | You know your rights before you sign | Building Act 2004 requirements, met as standard |
| Written variations | No cost you haven't agreed to | I reissue drawings and schedules with a new version number |
| Flooring planned with the cabinetry | No pinned floors and no height problems | I select flooring as part of kitchen interior design |
| One designer from start to finish | The detail is held for you | Project management integration through to handover |
| Chef, construction and psychology background | A kitchen that works, can be built and suits how you live | CKDNZ-qualified, with chef training, contracts experience and postgraduate psychology study |
Kate Blakeborough, CKDNZ. The considered hand behind every Design Suite kitchen.
Kitchen Renovation Questions.
Where do I start with a kitchen renovation?
Start with how you use the kitchen now, what frustrates you, and how your household will live over the next ten years. Set a working budget, then book a design consultation before speaking to trades, so the layout is resolved before anyone prices the work.
How long does a kitchen renovation take in New Zealand?
Allow roughly four to six months from first consultation to finished kitchen. Design, selections and pricing take about five to eight weeks, cabinetry about six to ten weeks, and on-site work about six to eight weeks.
What order do the trades go in during a kitchen renovation?
Strip-out and site preparation come first, then any building or structural work, then pre-plumbing, pre-wiring and rangehood ducting. Next come wall linings, plastering and painting, then fixed flooring, cabinetry, benchtops and splashback. Floating floors follow the cabinetry, and plumbing, electrical fit-off and appliances finish the job.
Should the kitchen or the flooring go in first?
It depends on the floor. Fixed floors such as tiles or glued-down timber go in first, under the cabinetry. Floating floors such as laminate or vinyl plank go in after the cabinetry, running to the kickboards.
What should I avoid in a kitchen renovation?
The most common regrets are too little bench space beside the cooktop and sink, too few drawers, poor task lighting and power points in the wrong places. Most come from choosing finishes before resolving the layout.
Can I live in the house during a kitchen renovation?
Usually, yes. Plan for about four to six weeks without a working kitchen, depending on the scope of work and your benchtop choice. A temporary set-up with a fridge, microwave, kettle and portable induction plate makes it manageable.
Begin a Design Conversation.
If you're planning a kitchen renovation in the Bay of Plenty, the earlier the design starts, the more options you keep. I'll come to your home, look at the space and how you live in it, and talk through what a considered renovation would involve. Once you get in touch, my client questionnaire takes you through how you live and who cooks, ergonomics and which hand you favour, your styling and colour palette, and the surfaces you are drawn to, so our first conversation starts from your home rather than a blank page.